Electrical Connection

  • LV one off connections and multiple domestic sites
  • 11kV Distribution substations for small industrial commercial sites
  • 33kV Primary substations for major integration projects, such as larger solar, biomass and rail connections
  • 33kV Infrastructure systems to extend or support existing utility systems for new developments
  • 66 – 132kV Larger load based infrastructure projects for customers requiring 24Mva and above
     

Electrical Connection Case Studies

FileTypeSizeUploaded onDownload
Case Study G.R.Ward and SonsPDF565.44 KB22 Apr, 2014 Download
Case Study Concept PlasticsPDF583.21 KB22 Apr, 2014 Download
Case Study Bradford Manor Solar ParkPDF553.89 KB26 Nov, 2013 Download
Case Study Witches Solar FarmPDF585.92 KB26 Nov, 2013 Download
Case Study Higher Hatherleigh Solar ParkPDF514.14 KB26 Nov, 2013 Download
Case Study Mid UK CaythropePDF543.55 KB26 Nov, 2013 Download

 
Request a Quote
 
Case Studies

Terms & Conditions  |  Accessibility  |  Privacy & Cookies

GEW2 Limited 2015. All rights reserved - Registered Office: 370-374 Nottingham Road, Newthorpe, Nottingham, NG16 2ED

Web Design Mansfield

iso 9001iso 14001Rail ForumCHAS